How Epoxy Flooring Installation Works in Melbourne

Fresh light grey epoxy floor in a white commercial corridor with fire safety doors and yellow caution tape

A good epoxy floor is built in a clear sequence: inspect the slab, agree the scope in writing, prepare the concrete, apply the system, then hand the floor back with cure instructions. This guide walks through that process for a typical Melbourne garage, shed or similar space, so you know what happens before anyone arrives with a grinder.

It is not a do-it-yourself manual. If you are comparing a kit with a professional system, start with DIY versus professional epoxy. What follows is how a Floor Lab installation is organised.

Step 1: a free site visit and a written quote

Quoting is in person only. We come to the property, look at the concrete, and talk through how you use the room and which finish you prefer. That visit is how we judge moisture, existing coatings, cracks, access and the right system. We typically send a written, fixed quote within 24 hours of seeing the slab.

A single garage starts from $2,000 and a double garage from $2,800. Metallic garages start from $6,000, and larger areas start from $50 per square metre. Those starting figures include diamond grinding and a 7-year workmanship warranty. The quote sets out what is actually included for your floor.

Most standard residential garages take 1 to 2 days, depending on the slab condition and any crack repair. Metallic garage floors take 3 to 4 days. We confirm that timeline at the site visit, not as a generic promise.

Step 2: clear the space before we arrive

The room needs to be completely clear. We do not move furniture, vehicles, tools or stored items. For a garage, that means cars, bikes, fridges and boxes are out before work starts. If something cannot be moved, tell us at the visit so the scope can be written around it.

Good access for equipment and a plan for dust management also come up at this stage. Nearby rooms, pets and household schedules are easier to plan when they are mentioned early.

Step 3: diamond grinding and slab repairs

Preparation is the part that decides how well the floor lasts. We diamond grind the concrete to remove the weak surface paste and create a mechanical profile. We do not acid etch. Moisture is checked. Cracks are assessed and filled where that is appropriate, and unsound patches are repaired. Old paint and contamination are dealt with if they are present.

Our guides to diamond grinding versus acid etching, moisture testing and repairing cracks before epoxy explain those checks in more detail. The Concrete Institute of Australia is a useful independent reference on concrete quality and moisture.

Step 4: primer, colour or flake, and the topcoat

A standard installation includes a primer coat, a broadcast or colour coat, and a UV-stable polyurethane topcoat. Some systems include additional build coats. The quote outlines exactly what will be applied.

For flake floors, coloured vinyl flakes are broadcast into the wet base coat, then locked in and protected by the clear coats. Ultra Flake is Floor Lab's standard flake range. Hyper Flake is the premium flake range. Metallic systems are applied as a decorative colour coat over the prepared, primed slab. All Purpose Coatings publishes product information for the systems we use.

The finish you choose is agreed before work starts, using samples where possible, because colours read differently in your doorway than they do on a screen. See the epoxy flake flooring service and garage epoxy flooring pages for the main residential options.

Melbourne weather is part of the plan, even for an enclosed garage. We monitor conditions and will not apply epoxy if rain or temperatures would compromise the curing window. Garages are generally protected, so rain is rarely the issue it would be on an outdoor slab, but the schedule still follows the conditions on the day rather than a fixed script.

Step 5: cure, handover and the warranty

Once the final coat is down, the floor needs time to cure. Light foot traffic is usually safe after 24 to 48 hours, and we give you specific instructions for your job based on the system and the conditions on the day. Cars can typically be parked after 5 to 7 days. Waiting the full 7 days is the cautious approach. Heavy vehicles and forklifts should wait 7 to 14 days. The cure time guide and the FAQ set those stages out in full.

Completed floors are backed by a 7-year workmanship warranty covering delamination, peeling and coating failure caused by the installation process. It does not cover damage from improper maintenance, physical impact, or use before the curing period has passed.

At handover you receive the cure instructions for your job, including when light foot traffic is appropriate and when cars can go back in. Keep the space clear until those times have passed. If you later want to refresh a sound, worn floor, that is a different conversation, covered in when to recoat an epoxy garage floor.

Frequently asked questions

How long does epoxy flooring installation take?

Most standard residential garages take 1 to 2 days, depending on the slab condition and any crack repair. Metallic garage floors take 3 to 4 days. We confirm the timeline at your free site visit.

Do I need to be home for the whole installation?

You need to provide clear access and a completely empty space at the start. We will agree practical arrangements for the days we are on site when we book the work.

When can I walk on the floor, and when can I park?

Light foot traffic is usually safe after 24 to 48 hours, with job-specific instructions. Cars can typically be parked after 5 to 7 days. Heavy vehicles should wait 7 to 14 days.

How do I start the process?

Request your in-person quote or call 0468 159 615. We inspect the slab, send a written quote typically within 24 hours of the visit, and then book installation once you are happy with the scope.

Get an in-person quote

If you want a clear picture of how an epoxy installation would run in your garage or shed, the next step is a free site visit. Request your in-person quote, or call 0468 159 615, and a Floor Lab specialist will inspect the concrete, confirm the timeline and send a written scope. Browse finished floors in the gallery or start with garage epoxy flooring.

Back to all articles | Get a free quote